Over the last few months, Emmetitech s.r.l. successfully completed the contract for the project "POSCO - SOUTH KOREA - COP6". The project involved the engineering revamping of the Coke Oven Batteries A & B of the new plant n°6 for POSSO, located in Pohang, South Korea.

 

Project description

Our company has carried out the detailed engineering activities necessary for the design and implementation of the control system for the preheating of coke oven batteries. Each battery includes 48 furnaces and 2 straps, each equipped with two burners (one machine side and one coke side).

 

Project objectives

The main objectives of the project were:
  • Improve operational efficiency and safety of the pre-heating process.
  • Reduce pollutant emissions through an advanced control system.
  • Ensure optimal resource management through the adoption of innovative technologies.
 

Technical Solution

Our team has carried out several key activities:
  • Design and implementation of a custom automation system based on advanced control technologies.
  • Installation of new high energy efficiency burners and low environmental impact.
  • Optimization of the pre-heating process to ensure uniformity and stability in battery operations.
The project, completed on schedule, was a significant success, confirming Emmetitech's ability to provide cutting-edge engineering solutions that meet the complex needs of customers in the global industrial sector.

Sector and Context

The project is part of the modernisation of industrial infrastructure, aiming to improve production efficiency and reduce environmental impact. Our experience in the field has enabled us to deal with engineering challenges with competence, delivering a solution that represents a reference model for future initiatives.